Khairpur Sugar Mills

Solution
Industrial
System
400 kW Ongrid
Location
Khairpur

About the Install

A sugar mill does not consume electricity evenly. The crushing season concentrates demand into a few intense months, the plant is motor-heavy with substantial starting currents, and the air carries bagasse dust that settles on everything including the array.

At 400 kW the system is sized to sit comfortably beneath the mill’s running load, which means every unit generated is consumed on site rather than exported — the most favourable position solar economics allows. The design accounts for the dust through row spacing that permits proper access and a cleaning schedule built into the scope rather than sold afterwards. The array produces around 53,300 units a month.

0

kW Installed

0

Units generated per month

0

Tonnes Co2 avoided annually
Who are we

Ideal Power Solutions leads the way in offering smart solar solutions for homes. Our mission is to help people get the most out of our sun with ease and trust.

Started in 2018, we grew from a small team to a trusted energy partner for organisations like South City, IBA Pakistan, Khairpur Sugar Mills, Karachi Gymkhana and Karachi Port Terminal, known for reliability

We told them the plant does not stop. They planned the whole installation around our shifts and it did not. That is harder than it sounds, and it is why we would use them again.

Ghulam Rasool Soomro

Vice President Engineering

Energy tech
Home Energy
Clear solutions

Efficiency

Power upgrades

Renewal

Project Snapshot

Meta field
Value
Client
Khairpur Sugar Mills · Industrial
System
400 kW Ongrid
Location
Khairpur
Stat
Figure
400
kW installed
53,300
units generated per month
288
tonnes CO₂ avoided per year
Quick Facts

Project Snapshot

Location —
Industry Industrial
Property Type Industrial
Installed Capacity 400 kW Installed
Equipment —
Project Duration —
Completion Date —
Net Metering —